Abry Brothers, Inc. is a Full Service Contractor handling a variety of different types of jobs.
Not all shoring methods are applicable to all types of problems.

  • House Raising and Elevation
  • House Leveling
  • Raised House Foundation
  • Structural Carpentry
  • Wood Member Replacement
  • Slab Houses
  • Segmental Piling Installation
  • Foundation/Piling Replacement and Repair Jobs
  • Specialty Shoring
  • Historic Repair and Structural Restoration

Special and Unique Projects:

 Houma House Plantation
 Jazz & Heritage Building
 House of Blues
 Mater DoLoRosa Church
 Jax Brewery
 Tulane Alumni House
 Planet Hollywood
 Antoine's Restaurant
 Real Uptown Superstore
 Longue Vue Gardens Cottage
 U.S. Navy Contract
 Theatre of Performing Arts
 Walter Anderson Museum of Art  N.O. Police Station, Special Operations Div.
 Whitney Bank
 Waldo Burton Boys Home
 Governmnet Contracts
 StoreAll - Tchoupitoulas St.
 Soft Touch (now Oasi) Car Wash  N.O. Auction House
  Louise McGee School
Procedures…

In order to successfully execute necessary repairs, please be aware of these routine procedures:

  • Delivery of equipment and material to job site and set up procedure
  • Installation of jacking system
  • Digging additional foundations if necessary
  • Raise and/or level house
  • Installation of shims
  • Removal of damaged wood members
  • Replacement of wood members with treated material
  • Elevations recorded before and after leveling
  • Digging and tunneling around existing foundation
  • Excavated dirt will be stockpiled in convenient location on job site
  • Installation of new segmental precast pilings
  • Backfill with excavated dirt or for additional charge dirt will be removed and backfilled with river sand

Also, please note that there may be all of the above, some of the above, or some of the above in combination with other routines. In most cases, the majority of work can be completed outside and underneath the house. Normally, one of our superintendents will require access to take elevations on the day the house is raised. In Jefferson Parish, the Code requires that your gas meter be removed on the day the house is raised, and reconnected after your plumber completes a test on the lines.

 